Department of Homeland Security

Border Station and Detention Center

Brownsville, Texas.

 

Architect:  Smithgroup

General Contractor:Sundt Construction

Special systems cost:​​  $910,000.00

Project ManagerStephen Manwell

Project Supervisor:Gabriel Navarro

Project Safety:  Erasmo​​ Cazares

Date complete:2007

 

 

 

Scope of work

 

Designed and implemented the installation of an integrated access control, CCTV and fire alarm systems. Project was completed in 2008. The integrated access control, CCTV, Intrusion, duress and fire alarm systems were designed and implemented based on using a Hirsch Electronics Velocity access control platform. The CCTV and access control systems were integrated to provide real time viewing and ID card verification at the local Command Center as well as Sector HQ.​​ 

 

Brownsville CBP consists of two buildings. The campus consists of over​​ 30​​ acres of area with an extensive perimeter system using CCTV and access control. The detention facility is fully controlled by access control and video.

 

 