Profile
Department of Homeland Security
Border Station and Detention Center
Brownsville, Texas.
Architect: Smithgroup
General Contractor: Sundt Construction
Special systems cost: $910,000.00
Project Manager Stephen Manwell
Project Supervisor: Gabriel Navarro
Project Safety: Erasmo Cazares
Date complete: 2007
Scope of work
Designed and implemented the installation of an integrated access control, CCTV and fire alarm systems. Project was completed in 2008. The integrated access control, CCTV, Intrusion, duress and fire alarm systems were designed and implemented based on using a Hirsch Electronics Velocity access control platform. The CCTV and access control systems were integrated to provide real time viewing and ID card verification at the local Command Center as well as Sector HQ.
Brownsville CBP consists of two buildings. The campus consists of over 30 acres of area with an extensive perimeter system using CCTV and access control. The detention facility is fully controlled by access control and video.
Contact
Gabriel Vasquez Jr.
4401 S. 281
Edinburg, Texas 78539
956-289-4987